2012 Montrose PoolInstallation was completed today of the numeric scoreboard and Colorado Time Systems swim timing system at the new £9m sports centre and swimming pool in Montrose. The six-lane pool looks great with the addition of our equipment and is said to be a real benefit to the area with swimmers of all ages and abilities being able to use the pool